
April 2006
SKYJACK, Page 22
SJIII Series E - CONVENTIONALS
Section 2 - Operation
Setup Procedure
8.
Move the aerial platform to a firm, level test area
where the platform can be later vertically
extended to its maximum working height. If the
aerial platform is to be pushed, towed or winched,
refer to
procedures.
9.
Unlock and swing out the hydraulic/electric tray.
10. Check the tank’s hydraulic oil level (scissor
assembly must be fully lowered). Level should
be at or slightly above the top mark on the sight
glass.
Note
If required, add a quality grade hydraulic oil such as
ATF Dexron III (ESSO). Never mix hydraulic oils.
11. Close the hydraulic/electric tray.
12. Unlock and swing out the battery tray.
13. Check the battery fluid level. If fluid level is not at
FULL mark on the battery, add distilled or
demineralized water only.
Warning
Explosion Hazard
Keep flames and sparks away. Do not
smoke near batteries.
Warning
Battery Acid Is Extremely Corrosive
Wear proper eye and facial protection as well as
appropriate protective clothing.
If contact occurs, immediately flush with cold
water and seek medical attention.
14. Connect the AC battery charger cord to the proper
AC voltage source and charge the batteries. Refer
to
for battery charging procedures.
When charger cycle is complete, disconnect
battery charger AC cord.
15. Close the battery tray.
2.4 Setup Procedure
The following are descriptions of normal operating pro-
cedures. A qualified operator
MUST
read and com-
pletely understand these descriptions before operat-
ing this aerial platform.
1.
Before a new aerial platform is put into operation it
must be carefully inspected for any evidence of
damage resulting from shipment and inspected
periodically thereafter. Refer to
Maintenance and Inspection Schedule.
2.
Remove all packing materials and inspect for
damage incurred during transport. Report any
damage to delivery carrier immediately.
3.
Inspect aerial platform thoroughly and remove
any foreign objects.
4.
Raise all guardrails to their upright position and
lock in place with locking pins. Refer to
Warning
Before operating this aerial platform
check the guardrail system for loose or missing
locking pins. The guardrail system must be upright
and all pins must be locked in place.
Death or serious injury could result if the guardrail
system is not upright or properly locked.
5.
Ensure the emergency main power disconnect
switch is switched to the “OFF” position.
6.
Remove the operator’s control box from its
shipping container and secure it to the guardrail
at the right front of the platform.
7.
Attach the control cable and power extension
deck cable
(if equipped)
to the machine’s control
cable.
Содержание 6826El
Страница 47: ...MOBILE ELEVATING PLATFORMS www skyjackinc com ...