Ionics Instruments
2004
Page 8-15
DLM 30007-08 Rev. A
7. Place one Allen screw in the sample pump pressure plate. Firmly
hold the pump with your thumb while squeezing the pressure plate
with your fingers until the screw drops into position. Tighten the
screw one turn, then insert the other screw and make sure it drops
into position. With both screws in position, use the Allen wrench to
secure the pressure plate, making sure the screws are tight.
8. Inspect the tubing to ensure it is not close to the servo (moving)
mechanisms on the syringe pumps, repositioning the tubing if
necessary.
9. Close the top panel.
10. Record the installation date for the pump tubing in the service log.
11. Plug in the main power cord and turn the power switch on. The
analyzer will start initialization.
12. Stop the analyzer and follow the procedures listed below to enter the
installation date for the pump tubing in the CONSUMABLES menu.
Entering the Installation Dates for Reagents, UV Lamp, and Pump Tubing
After changing the reagents, UV lamp, or pump tubing, you must enter the
installation date. From the MAIN menu, scroll to MAINTENANCE and press
ENTER.
1. Use the arrows ( or ) to scroll to CONSUMABLES and press
ENTER to display the CONSUMABLES menu:
OXIDIZER
ACID
LAMP
PUMP TUBING
ENTER
CLEAR
REAGENT FLUSH
PRINT REPORT
FIGURE 8-5: CONSUMABLES Menu
Содержание TOC 800
Страница 6: ...Ionics Instruments 2004 Page v DLM 30007 08 Rev A Declaration of Conformity ...
Страница 22: ...Ionics Instruments 2004 Page 1 1 DLM 30007 08 Rev A ...
Страница 209: ...Ionics Instruments 2004 Page 10 1 DLM 30007 08 Rev A ...
Страница 218: ...Ionics Instruments 2004 Page 11 9 DLM 30007 08 Rev A ...
Страница 252: ...Ionics Instruments 2004 Page E 8 DLM 30007 08 Rev A ...