Ionics Instruments
2004
Page 8-12
DLM 30007-08 Rev. A
16. Follow the procedures listed in this chapter to enter the installation date for
the UV lamp in the CONSUMABLES menu. If the reagents have been
changed, be sure to enter the installation date in the CONSUMABLES
menu for the reagents.
17. After changing the UV lamp, perform a calibration verification using
instructions in the Calibration chapter.
Replacing the Pump Tubing
The tubing for the sample pump loses elasticity over time and must be replaced once
a year to ensure proper flow rates. The tubing must be purchased from Ionics
Instruments; use of tubing from other sources or failure to replace the tubing on the
prescribed replacement schedule will affect instrument functionality.
A 3/32" Allen wrench is supplied with the instrument to replace the pump tubing.
WARNING
Installation of the pump tubing requires access to the inside of the instrument.
To avoid potentially dangerous shock, disconnect the power cord before
opening the instrument's top panel.
WARNING
To avoid exposure to the acidified water in the tubing, wear acid resistant
gloves, protective clothing, and safety goggles or a face shield, when changing
the pump tubing.
To remove the old tubing:
1. Turn off the main power switch and unplug the power cord
2. Open the instrument top panel by pushing back on the two black catches
and lifting the panel upwards.
Содержание TOC 800
Страница 6: ...Ionics Instruments 2004 Page v DLM 30007 08 Rev A Declaration of Conformity ...
Страница 22: ...Ionics Instruments 2004 Page 1 1 DLM 30007 08 Rev A ...
Страница 209: ...Ionics Instruments 2004 Page 10 1 DLM 30007 08 Rev A ...
Страница 218: ...Ionics Instruments 2004 Page 11 9 DLM 30007 08 Rev A ...
Страница 252: ...Ionics Instruments 2004 Page E 8 DLM 30007 08 Rev A ...