Ionics Instruments
2004
Page 4-12
DLM 30007-08 Rev. A
3. Locate the reagent supplies in a covered enclosure located at the
front, right-hand side of the analyzer and open the top cover on the
reagent enclosure by loosening the two screws located at the back of
the reagent enclosure and removing the cover.
4. Locate the ACID supply line. It is labeled with the word ACID. At the
end of this line there is brown knurled nut.
5. Inspect the ACID reagent cartridge. The Mininert valve must be in
the closed position. Observe the labeling on the cartridge for proper
positioning.
FIGURE 4-7: Label on Reagent Cartridges
WARNING
Acid may spill from the container if the valve is not in the closed position.
6. Align the ACID reagent cartridge with Mininert valve to the brown
knurled nut. Once the cartridge is aligned with the brown knurled nut,
turn the brown knurled nut clockwise while holding the reagent
cartridge. Turning the nut rather than the cartridge will prevent the
tubing from twisting. Tighten to finger tight. Do not overtighten the
nut.
7. Open the Mininert valve on the ACID container by pressing on the
green button to slide the Teflon bar fully inward. Reference the label
on the container to verify direction.
valve operation
GREEN IN = OPEN
RED IN = CLOSED
Содержание TOC 800
Страница 6: ...Ionics Instruments 2004 Page v DLM 30007 08 Rev A Declaration of Conformity ...
Страница 22: ...Ionics Instruments 2004 Page 1 1 DLM 30007 08 Rev A ...
Страница 209: ...Ionics Instruments 2004 Page 10 1 DLM 30007 08 Rev A ...
Страница 218: ...Ionics Instruments 2004 Page 11 9 DLM 30007 08 Rev A ...
Страница 252: ...Ionics Instruments 2004 Page E 8 DLM 30007 08 Rev A ...