Mounting / connection
4.2 Connection
M200D PROFIBUS/PROFINET
116
Manual, 08/2014, A5E01577426A/RS-AA/004
Requirements
●
The communication module is mounted on the motor starter module as shown in Chapter
Installing the communication module (Page 99).
●
You have assigned the device name according to your configuration. Further information:
Assigning IO device names (PROFINET IO) (Page 123)
Required tools
●
Screwdriver (PZ 2; 2 Nm)
●
Stripping tool for wiring the M12 and 7/8" cable connectors, if you are fabricating your
own cables.
Required accessories
●
Prefabricated cable with M12 and 7/8" cable connectors. The cables are available in
different lengths.
●
If you are fabricating your own cable:
–
M12: 4-core, shielded bus cable, and decoded M12 cable connector (PROFINET)
–
7/8": 4-core cable with 7/8" cable connectors
Pin assignment of the M12 and 7/8" cable connectors
PROFINET connection (M12)
Each port is connected via an M12 socket (D coding).
Pin
Assignment
M12-D
1
Transmission data + (TD+)
2
Receive data + (RD+)
3
Transmission data – (TD–)
4
Receive data – (RD–)
Содержание SIRIUS M200D
Страница 2: ......
Страница 16: ...Product description 1 3 PROFIenergy M200D PROFIBUS PROFINET 16 Manual 08 2014 A5E01577426A RS AA 004 ...
Страница 24: ...Product family 2 3 Design concept M200D PROFIBUS PROFINET 24 Manual 08 2014 A5E01577426A RS AA 004 ...
Страница 90: ...Functions 3 22 Logbook M200D PROFIBUS PROFINET 90 Manual 08 2014 A5E01577426A RS AA 004 ...
Страница 118: ...Mounting connection 4 2 Connection M200D PROFIBUS PROFINET 118 Manual 08 2014 A5E01577426A RS AA 004 ...
Страница 222: ...Appendix A 2 Order numbers M200D PROFIBUS PROFINET 222 Manual 08 2014 A5E01577426A RS AA 004 ...
Страница 224: ...Correction sheet M200D PROFIBUS PROFINET 224 Manual 08 2014 A5E01577426A RS AA 004 ...
Страница 232: ...Index M200D PROFIBUS PROFINET 232 Manual 08 2014 A5E01577426A RS AA 004 ...
Страница 233: ......