
Typical inverter load cycles
VORDGF\FOHEDVHGRQ
+LJK2YHUORDG
VORDGF\FOHEDVHGRQ
/RZ2YHUORDG
,
/2
,
/2
,
+2
,
/2
,
V V
V
V
W>V@
,
+2
,
,
+2
V V
V
V
W>V@
Figure 7-1
"Low Overload" and "High Overload" load cycles
Technical data
7.3 Overload capability of the inverter
Power Module PM240-2
78
Hardware Installation Manual, 08/2017, A5E33294624B AG
Содержание SINAMICS G12
Страница 2: ......
Страница 8: ...Table of contents Power Module PM240 2 8 Hardware Installation Manual 08 2017 A5E33294624B AG ...
Страница 10: ...Changes in this manual Power Module PM240 2 10 Hardware Installation Manual 08 2017 A5E33294624B AG ...
Страница 118: ...Spare parts Power Module PM240 2 118 Hardware Installation Manual 08 2017 A5E33294624B AG ...
Страница 156: ...Appendix A 4 Abbreviations Power Module PM240 2 156 Hardware Installation Manual 08 2017 A5E33294624B AG ...
Страница 159: ......