You must re-attach the connection covers in order to re-establish the touch protection of the
inverter after it has been connected up.
Connecting DC link or braking resistor
Use the rubber cable gland as shown in the right-
hand figure for connecting the braking resistor.
Using a sharp knife, cut the cap of the cable gland
corresponding to the diameter of the connection ca‐
ble of the braking resistor and establish the connec‐
tions.
Connect the braking resistor at the R1 and R2 ter‐
minals.
An optional shield plate is available as strain relief
for the connection cable of the braking resistor.
Top shield plate - FSD … FSF (Page 120)
The connections for the DC link have not been re‐
leased in the current version.
Connecting-up
5.2 Connecting the line and motor cable at the inverter
Power Module PM240-2
Hardware Installation Manual, 08/2017, A5E33294624B AG
63
Содержание SINAMICS G12
Страница 2: ......
Страница 8: ...Table of contents Power Module PM240 2 8 Hardware Installation Manual 08 2017 A5E33294624B AG ...
Страница 10: ...Changes in this manual Power Module PM240 2 10 Hardware Installation Manual 08 2017 A5E33294624B AG ...
Страница 118: ...Spare parts Power Module PM240 2 118 Hardware Installation Manual 08 2017 A5E33294624B AG ...
Страница 156: ...Appendix A 4 Abbreviations Power Module PM240 2 156 Hardware Installation Manual 08 2017 A5E33294624B AG ...
Страница 159: ......