6.2
Commissioning after a long storage time
If the inverter was not operational for a longer period of time, it is possible that you must form
the DC-link capacitors before switching on.
Form the DC-link capacitors in the following cases:
● If the inverter was not operational for longer than one year.
● If the date of manufacture of the inverter was more than one year ago when commissioning
the drive system for the first time. The date of manufacture is coded in the serial number
(see the next paragraph).
You form the DC-link capacitors by connecting power to the inverters as shown below.
)RUPLQJIRUVWRUDJHWLPHVRI\HDUV
)RUPLQJIRUVWRUDJHWLPHVRI\HDUV
)RUPLQJIRUVWRUDJHWLPHVRIDQGPRUH\HDUV
50
25
0
1
0,5
2
3
4
5
6
7
8
75
100
U [V]
t [h]
Figure 6-1
Forming the DC-link capacitors
Data of manufacture of the inverter
The date of manufacture of the inverter is coded in positions 3 - 6 of the serial number.
'D\RIPDQXIDFWXUH
'D\RIPDQXIDFWXUH
-DQXDU\
0DUFK
0D\
-XO\
6HSWHPEHU
1 1RYHPEHU
)HEUXDU\ $SULO
-XQH
$XJXVW
2 2FWREHU
' 'HFHPEHU
<HDURIPDQXIDFWXUH
$
'
+
/
3
7
:
%
(
-
0
5
8
;
&
)
.
1
6
9
61'
Figure 6-2
Data of manufacture in the serial number (example, April 21, 2013)
Service and maintenance
6.2 Commissioning after a long storage time
Power Module PM240-2
Hardware Installation Manual, 08/2017, A5E33294624B AG
69
Содержание SINAMICS G12
Страница 2: ......
Страница 8: ...Table of contents Power Module PM240 2 8 Hardware Installation Manual 08 2017 A5E33294624B AG ...
Страница 10: ...Changes in this manual Power Module PM240 2 10 Hardware Installation Manual 08 2017 A5E33294624B AG ...
Страница 118: ...Spare parts Power Module PM240 2 118 Hardware Installation Manual 08 2017 A5E33294624B AG ...
Страница 156: ...Appendix A 4 Abbreviations Power Module PM240 2 156 Hardware Installation Manual 08 2017 A5E33294624B AG ...
Страница 159: ......