2-1
Automation System S7-400 Hardware and Installation
A5E00850741-01
Installing the S7-400
Chapter Overview
Section
Description
Page
2.1
S7-400 Installation
2-2
2.2
Installing the Central Rack (CR) and Expansion Rack (ER)
2-6
2.3
Segmented CR
2-8
2.4
Subdivided CR
2-9
2.5
Mounting and Grounding the Racks
2-10
2.6
Chassis Terminal Connection in the Non-Isolated Configuration
2-16
2.7
Methods of Ventilation
2-18
2.8
Changing the Ventilation with the Cable Duct and Fan Subassembly
2-20
2.9
Installing the Fan Subassembly
2-22
2.10
Installing the Cable Duct
2-24
2.11
Choosing and Setting up Cabinets with the S7-400
2-25
2.12
Rules for the Arrangement of Modules
2-29
2.13
Installing Modules in a Rack
2-30
2.14
Marking the Modules with Slot Labels
2-33
2.15
Methods of Expansion and Networking
2-34
2.16
Accessories
2-35
2
Содержание Simatic S7-400
Страница 6: ...Preface vi Automation System S7 400 Hardware and Installation A5E00850741 01 ...
Страница 52: ...Installing the S7 400 2 36 Automation System S7 400 Hardware and Installation A5E00850741 01 ...
Страница 60: ...Addressing the S7 400 3 8 Automation System S7 400 Hardware and Installation A5E00850741 01 ...
Страница 128: ...Networking 5 30 Automation System S7 400 Hardware and Installation A5E00850741 01 ...
Страница 148: ...Commissioning 6 20 Automation System S7 400 Hardware and Installation A5E00850741 01 ...
Страница 228: ...Index Index 4 Automation System S7 400 Hardware and Installation A5E00850741 01 ...