Contents
xii
Automation System S7-400 Hardware and Installation
A5E00850741-01
Tables
2-1
Cabinet types
2-26
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2-2
Modules in the different racks
2-29
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2-3
Accessories for Modules and Racks
2-35
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4-1
VDE Specifications for Assembling a Programmable Controller
4-5
. . . . . . . .
4-2
Methods of Protective Grounding
4-13
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4-3
Grounded connection load voltage
4-14
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4-4
Front connector coding elements
4-32
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5-1
Permitted Cable Length of a Segment in an MPI Network
5-15
. . . . . . . . . . . . .
5-2
Permitted Cable Length of a Segment in the PROFIBUS-DP Network
Depending on the Transmisson Rate
5-15
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5-3
Lengths of Spur Lines per Segment
5-16
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5-4
Features of the Fiber-Optic Cables
5-24
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5-5
Order Numbers - Fiber-Optic Cables
5-26
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5-6
Order Numbers - Simplex connectors and connector adapters
5-27
. . . . . . . .
5-7
Permissible Cable Lengths on the Optical PROFIBUS-DP Network
(Partyline Topology)
5-28
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6-1
Checklist to be Used Before Switching On for the First Time
6-3
. . . . . . . . . .
6-2
Setting the Battery Monitoring Switch
6-5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A-1
Key for Example 1
A-11
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A-2
Cabling Inside Buildings
A-17
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A-3
High-Voltage Protection of Cables with the Help
of Surge Protection Equipment
A-23
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A-4
Low-Voltage Protection Components for
Lightning Protection Zones 1 <--> 2
A-26
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A-5
Surge Protection Components for Lightning Protection Zones 2 <--> 3
A-27
.
A-6
Example of a Circuit Conforming to Lightning Protection Requirements
(Legend to Figure A-7)
A-29
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Содержание Simatic S7-400
Страница 6: ...Preface vi Automation System S7 400 Hardware and Installation A5E00850741 01 ...
Страница 52: ...Installing the S7 400 2 36 Automation System S7 400 Hardware and Installation A5E00850741 01 ...
Страница 60: ...Addressing the S7 400 3 8 Automation System S7 400 Hardware and Installation A5E00850741 01 ...
Страница 128: ...Networking 5 30 Automation System S7 400 Hardware and Installation A5E00850741 01 ...
Страница 148: ...Commissioning 6 20 Automation System S7 400 Hardware and Installation A5E00850741 01 ...
Страница 228: ...Index Index 4 Automation System S7 400 Hardware and Installation A5E00850741 01 ...