Boards for HiPath 3000
Nur für den internen Gebrauch
A31003-H3590-S100-7-7620, 06/2012
3-70
HiPath 3000/5000 V9, Service documentation
boards.fm
Central Board
●
The batteries were fully charged when the measurement was started.
The maximum bridging times given in the tables are basic orientation values. They can vary
from the values given here depending on your system configuration.
Table 3-26
HiPath 3350 – Maximum bridging times
Power supply unit
Load levels
Maximum bridging
time
UPSC-D
48-V/1.2-Ah battery pack
Normal output load 100 % =
5 V und 3 A / –48 V und 0,5 A;
ringing approx. 2 VA
19 min
UPSC-D
Powerbox PB3000 with 48 V/7 Ah
(4 x 12 V/7 Ah) battery pack
Normal output load 100 % =
5 V und 3 A / –48 V und 0,5 A;
ringing approx. 2 VA
3 h
Table 3-27
HiPath 3550 – Maximum bridging times
Power supply unit
Load levels
Maximum bridging
time
UPSC-D
48-V/1.2-Ah battery pack
Normal output load 100 % =
5 V and 8 A / –48 V and 1.1 A;
ringing approx. 4 VA
6 min
UPSC-D
48-V/1.2-Ah battery pack
Normal output load 60 % =
5 V und 4,8 A / –48 V und 0,66 A;
ringing approx. 2 VA
15 min
UPSC-D
Powerbox PB3000 with 48 V/7 Ah
(4 x 12 V/7 Ah) battery pack
Normal output load 60 % =
5 V und 4,8 A / –48 V und 0,66 A;
ringing approx. 2 VA
2 h 30 min
Содержание HiPath 3000 Series
Страница 1252: ......