6. Fasten the bases to the foundation using at least 4 bolts M8 per panel. In the case of bases
for metering panels, all fixing points must be used.
Fig. 40:
Fixing points of the base on the foundation (example)
7. Close unused fixing points with silicone or adhesive tape.
The fixing points of the pressure relief duct and the switchgear are described in the dimension
drawings of the switchgear documentation.
Mounting the panels onto the bases
INFORMATION
If felt strips are fixed onto the bases, the panels cannot be moved easily on the bases.
⇨ Do not stick felt strips on the bases.
1. Lift the panel onto the base and move it into position. Remove the cable brackets if
necessary.
2. Align panel and base. Observe that the bolted joints between the base and the switchgear
frame are in line.
Fig. 41:
Positioning the panel
Fig. 42:
Aligning the panel flush
3. Remove the cable compartment cover [
Page 125, "Removing and mounting the cable
4. Remove the cross member [
Page 126, "Removing and mounting the cross member"].
Page 73, "Joining the panels"].
Joining the base and the panel
1. In the front area of the cable compartment, join the switchgear frame and the base using
2 fixing clips. Mount the fixing clips with bolts M8.
2. In the rear area of the cable compartment, join the switchgear frame and the base using at
least 4 fixing clips.