![SICK ZIRKOR200 Ex-G Скачать руководство пользователя страница 86](http://html.mh-extra.com/html/sick/zirkor200-ex-g/zirkor200-ex-g_operating-instructions-manual_1264210086.webp)
86
8024250/18HT/V2-0/2020-12| SICK
O P E R A T I N G I N S T R U C T I O N S | ZIRKOR200 Ex-G
Subject to change without notice
12
DECOMMISSIONING
12.2
Shutdown procedure
Carry out shutdown preparations
▸
Ensure the environment is Ex-free.
▸
Disconnect enclosure from power voltage (e.g. switch off the main switch of the host
system).
After shutdown
▸
In potentially explosive atmospheres: Wait at least 60 minutes after disconnecting from
the power voltage before opening the enclosure.
▸
Observe the safety information on the enclosure.
12.3
Removing the device
Removing the measuring system
1
Disconnect all cables to the power supply.
2
Disconnect all connecting cables between analyzer unit and control unit.
3
Disconnect all connecting cables between pneumatic unit and control unit.
4
Disconnect all cables of the customer wiring at the control unit.
5
Loosen the connection screws between the analyzer unit and gas channel and remove
the measuring probe.
6
Close the flanges on the gas duct with a cover.
7
Loosen the connecting screws of the pneumatic unit and remove the pneumatic unit.
8
Loosen the connecting screws of the control unit and remove the control unit.
9
Pack components in containers suitable for transport.
Information on storage,
see “Storage information”, page 34
.
12.4
Environmentally compatible disposal
The device should be disposed as industrial waste.
Material required
Part number
Required for
Flange cover
-
Covering the flange.
Personal protective equipment
-
Protection when working on the stack or hot
or aggressive sample gases.
Note:
Observe relevant local conditions for disposal of industrial waste.
Note:
Disposal of subassemblies containing residual substances which are harmful
to the environment
The following subassemblies could contain substances that have to be disposed of
separately:
▸
Electronics: Capacitors, rechargeable batteries, batteries
▸
Display: Liquid of LC display