INSTALLATION
5
5.3
Tools required
5.4
Material required
5.5
Preparing the measuring point
5.6
Transport
The device must be lifted and transported by at least two persons.
Tools required
Required for
Allen key set
Securing the enclosure cover
Slotted screwdriver set
Unlocking the connection terminals
Cross-head screwdriver set
Opening the analyzer electronics cover as well as
apertures
Ferrule pliers
Cable preparation
Wire stripper
Cable preparation
Material required
Required for
Ferrules
Cable preparation
NOTICE:
Basis for determining the measuring point:
●
Preceding project planning (e.g., based on the SICK application questionnaire)
●
Regulations of local authorities
Responsibility of the plant operator
●
Determining the measuring point
●
Preparing the measuring point
DANGER: Danger of explosion through electrostatic charges
There is a danger of explosion due to sparks caused by electrostatic charge, for example
during transport or when unpacking the analyzer unit and control unit.
▸
Only transport and unpack in an Ex-free area.
NOTICE:
The device may only be transported and installed by skilled persons who, based on their
training and knowledge as well as knowledge of the relevant regulations, can assess the
tasks given and recognize the dangers involved.