![SICK ZIRKOR200 Ex-G Скачать руководство пользователя страница 36](http://html.mh-extra.com/html/sick/zirkor200-ex-g/zirkor200-ex-g_operating-instructions-manual_1264210036.webp)
36
8024250/18HT/V2-0/2020-12| SICK
O P E R A T I N G I N S T R U C T I O N S | ZIRKOR200 Ex-G
Subject to change without notice
5
INSTALLATION
Fig. 9: Fitting the control unit
5.9.3
Fitting the analyzer unit
▸
Push the analyzer unit into the duct.
▸
Align V-shield to flow,
see “Installing and insulating the analyzer unit”, page 37
.
▸
Fix the analyzer unit to the duct.
Avoid vibrations greater than 2 g.
Observe enclosure protection class.
Ambient temperatures
Min.: -20 °C / Max.: +55 °C
Min.: -4 °F / Max.: +131 °F
Heavy device, ensure correct lifting and carrying.
1
2
3
Secure the enclosure on a structure that
can safely carry the weight of the enclosure.
Use expansion anchors when fitting the
enclosure on concrete.
Use vibration resistant fitting material when
fitting the enclosure in a steel frame.
Protect the device from long or strong
mechanical vibrations.
1
Drill holes according to the mounting
method for safe installation.
2
Use screws suitable for the substrate and
fastening method.
3
Control unit