COMMISSIONING
6
89
8017768/12AX/2019-05-31|SICK
Subject to change without notice
O P E R A T I N G I N S T R U C T I O N S | TIC
6
Commissioning
WARNING
Avoid strong vibrations and jolts at the measurement site
▸
Do not allow the system components of the profiling system to be exposed to excessive
vibrations or jolts as a result of construction work at the measurement site or within its
immediate vicinity (work involving compressors, road rollers/compactors, etc.).
▸
Switch off all components of the profiling system if strong vibrations are anticipated.
6.1
Starting the profiling system
Switch on the voltage supply.
The system starts up automatically when the power supply is connected.
Checking operating state
All components of the profiling system are checked for operational readiness.
The LED display for the connected devices indicates the device status during the
power-up cycle.
Operating state after 60 s
The system is ready for operation after approximately 60 seconds.
▸
Check the operational status of the components by looking at the status indicators.
6.2
Connecting to TEMS Manager
In principle, TEMS Manager can be started from any client computer that is connected
to the Traffic Controller via the external customer network.
Fig. 99: Connection between TEMS Manager and client computer
•
An up-to-date version of a web browser must be installed on the client computer.
•
This browser must support
HTML5
and
WebGL
.
Prerequisites