Product description
38
© SICK AG · Division Auto Ident · Germany · Subject to change without notice
8013796/UL20/2010-09-27
Operating Instructions
Laser Measurement Systems of the LMS500 Product Family
Chapter
3
3.12
Planning
3.12.1
LMS system requirements
For commissioning and operating the LMS, the following are required:
•
LMS500: Supply voltage DC 19.2 … 28.8 V, generated as per IEC 60364
F
4
F
41
(VDE 0100, part 410), output power minimum 24 W
•
LMS511: Supply voltage DC 19.2 … 28.8 V, generated as per IEC 60364
F
4
F
41
(VDE 0100, part 410), output power minimum 24 W.
Supply voltage for the heating DC 24 V, output power minimum 50 W (cyclic)
•
Data interface RS
F
232/RS-422, Ethernet and USB (optional, in case several LMS are
connected together in a network)
•
PC with operating system Windows 2000™, Windows XP™ or Windows Vista™ (see also
section 6.2.1 “System requirements for SOPAS ET” on page 58
)
3.12.2
Mounting requirements
The LMS must be mounted as follows:
•
robust
•
as far as possible without shocks
•
as far as possible without vibration
•
protected from direct sunlight and heat sources
Mounting kits
The following mounting kits are available:
•
mounting kit 1: mounting bracket for mounting at the rear on wall or machine (see
•
mounting kit 2: mounting bracket, only in conjunction with mounting bracket 1, cross-
wise adjustment possible (see
)
•
mounting kit 3: mounting plate, only in conjunction with mounting bracket 1 and 2,
length-wise adjustment possible (see
•
mounting with the Heavy Duty mounting bracket (see
)
Mount the LMS such that it is not exposed to direct sunlight (if necessary fit canopy). In this
way an inadmissible increase in the temperature inside the system is avoided.
Содержание LMS500-20000 PRO Indoor
Страница 1: ... ...