![Servomex NanoTrace DF-760E Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/servomex/nanotrace-df-760e/nanotrace-df-760e_instruction-manual_1247053036.webp)
32 DF-760E
Installation, Start Up and Shut Down
4.2.6 Purifier Installation
Shipping regulations require that the zero gas purifier be packaged separate from the
analyzer. As a result, the purifier must be installed by the user but this should be done after
the analyzer is operational. See page 129 for instructions.
4.2.7 Download System Data
The final step of the installation, after a couple days of dry down, should be to download
the diagnostics (see section 7.7.11) and send them by e-mail to Servomex for review. This
will allow the factory to confirm that the analyzer is working properly by comparison with
data stored at the time of shipment, and in addition will set a baseline for comparison with
future downloads, if any.
4.3
Analyzer Shut Down Or Disconnection
In order to minimize the time required for the analyzer to re-achieve a zero baseline on
start up, the following steps should be followed when shutting the analyzer down.
Short Term Shut Down
- A short-term shut down, for example to move and restart the
analyzer, can be accomplished by simply shutting off the power switch behind the front
door. This action initiates the standard isolation process and computer shut down which
takes approximately 40 seconds.
Long Term Shut Down
- From the Main Menu go to System, and select Isolate
Analyzer. A routine automatically starts that closes the downstream valve and allows
pressure to build in the moisture cell after which an upstream valve closes as well. In
addition the oxygen sensor is isolated. Throughout this process a message appears over the
display instructing the user to wait 40 seconds. Once complete, the message disappears and
the user may shut the power off with the switch behind the front door that initiates the
computer shut down sequence that takes an additional 40 seconds.
Additional long-term isolation security can be achieved by closing the valve on the
rotameter on the rear of the instrument as well as completely closing the sample inlet
regulator.
If the analyzer is being disconnected from gas, be sure to tightly cap all gas connections.
NOTE: See the section on Power up Default on page 109 for setting user selectable
preferences at the time of power up.
Loss of power will result in automatic valve closure and the following restoration of power
will result in the “Scan Disk” function occurring before system start-up.
Disconnection and Moving
–
Before disconnecting and moving the analyzer the
power cord should be disconnected from the AC receptacle.
Содержание NanoTrace DF-760E
Страница 1: ...NanoTrace Dual Moisture Oxygen Analyzer DF 760E Instruction Manual...
Страница 4: ......
Страница 38: ......
Страница 44: ......
Страница 122: ......
Страница 128: ......
Страница 138: ......
Страница 142: ......
Страница 143: ...Service DF 760E 139...
Страница 144: ...140 DF 760E...
Страница 148: ......
Страница 166: ......
Страница 168: ......
Страница 171: ...DF 760E 167...
Страница 173: ...Appendix A User Menu Screens DF 760E 169 Page 65 Page 66 Page 67 14 2 Oxygen Menus Page 72 Page 74 Page 86 Page 87...
Страница 174: ...170 DF 760E Appendix A User Menu Screens Page 88 Page 91 Page 93 Page 97 Page 98 Page 99...
Страница 175: ...Appendix A User Menu Screens DF 760E 171 14 3 System Menus Page 102 Page 103 Page 103 Page 106 Page 108 Page 109...
Страница 176: ...172 DF 760E Appendix A User Menu Screens Page 110 Page 111 Page 113 Page 114 Page 115 Page 116...