Operation
5 – ON Button
A long press (>1 second)
Turns the SP PRO On. Another long press SP PRO reverts to idle.
Two long presses when
in low DC shutdown
AC Coupled low DC shutdown recovery. See below or
6 – Export
This indicator flashes to show that the SP PRO is supplying the AC Load only with no export to grid. The SP PRO will not
export active power to the grid, as per the requirements of AS/NZS 4777.2:2200 appendix M.
7 – Silence Alarm Button
Turns off the audible alarm for this instance only. Alarm will re-sound with a new alarm condition.
8 – Alarm Indicators
Overtemp
Yellow
SP PRO is approaching an over temperature condition.
Red
SP PRO has shut down due to an over temperature condition.
Shutdown
Yellow
SP PRO is approaching a shutdown condition.
Red
SP PRO has shut down.
Attention
Off
Normal.
Yellow
Attention required, fan service request.
Flashing Yellow Either clean fan, fan fault or capacitor bank service request.
Red
Immediate attention required.
Flashing Red
Unit fault.
To determine specific reason for the attention indicator, see in SP LINK >
Data View
>
Now
>
Attention Required
.
9 – Battery ‘Fuel’ Gauge
These indicate the battery State of Charge (SoC). When the battery SoC is equal to the Shutdown SoC
in >
Configuration Settings
>
Inverter
then only the bottom LED is on. At 100% SoC all LEDs are green.
Top Indicator Flashing Red
Instant Hi DC Voltage Shutdown. Battery or battery wiring fault.
Bottom Indicator Yellow
Low Battery. Battery needs charging.
Bottom Indicator Red
Low Battery Shutdown. Inverter has shut down due to flat battery.
Bottom Indicator Flashing
Red
Instant Low DC Voltage Shutdown. Battery or battery wiring fault.
All Indicators Flashing Red
Inverter in emergency Low DC Shutdown Override
or AC Coupled Low Battery recovery mode. See
10 – Charging Mode
The Charging Mode panel indicates the present charging state. See
on page 46.
11 – Charging Source
AC – On
Power from the AC Source input supply (grid or generator) is charging battery bank.
Renewable – On
Power from any monitored renewable energy supply is charging battery bank.
Controls and Indicators
Содержание SPPRO 2i Series
Страница 1: ......
Страница 2: ...Selectronic Australia 2023 ...
Страница 51: ...47 Selectronic Australia Rev 41 Dec 2022 Operation SP PRO Operation ...
Страница 64: ...Contents Doc O10003 Part 004122 Rev 41 Dec 2022 ...