Installation
Diagram given as a reference only. Please ensure all wiring complies with relevant safety standards.
Backup Generator (Adv Feature) Control Wiring
When a backup generator is installed, control wiring should be fed up through the appropriate gland and
terminated to the SP PRO Expansion Card. The minimum required is one pair of wires for a generator-run
signal, which must be wired to one of the four relay outputs. CAT5-type cabling or any multi-conductor, multi-
strand cable is suitable for all control wiring. The Expansion Card can be plugged in and out of the SP PRO for
ease of wiring.
Cabling and Fusing