14
Selectronic Australia
Rev 41 - Dec 2022
Installation
7
- Undo five T20 Torx screws to remove terminal
plate. The expansion card remains secured to
SP PRO.
10 - Important points
•
Failure to fill all holes in the gland plates will
compromise IP rating and the thermal design.
•
Protective cover on expansion card
must
be
fitted.
•
Installation of the included battery temperature
sensor is imperative for correct and accurate
battery charging. Where a managed battery is
installed the temperature sensor should remain
connected to the expansion card and remain
coiled up in the SP PRO.
•
Verify all connections are tight and have correct
polarity.
Installing SPLC models
8
- Wiring can only be carried out by suitably
qualified installers and must adhere to all
relevant standards.
9
-
STOP
Detailed instructions for wiring the SP PRO are contained on the following pages.
These
must
be followed before proceeding with installation.
Содержание SPPRO 2i Series
Страница 1: ......
Страница 2: ...Selectronic Australia 2023 ...
Страница 51: ...47 Selectronic Australia Rev 41 Dec 2022 Operation SP PRO Operation ...
Страница 64: ...Contents Doc O10003 Part 004122 Rev 41 Dec 2022 ...