Galeo S / Galeo S Sub
7 Installing the line array system
19
7
Installing the line array system
7.1
Mounting the load adapter
The load adapter is mounted in the Cradle or Frame in the required position using two Locking
Pins. Information about positioning the load adapter and a definition of the pin point can be found in
section 4.5 of this manual. The mounting hole in the load adapter is suitable for shackles with a
rating of up to 1.5 t.
7.2
Mounting Galeo S to the Flying Cradle or Flying Frame
First of all the Snap-Fly links are pulled out a bit and then turned to the side. The Link Pin of the
uppermost Galeo S unit is also removed. The Flying Cradle or Frame is set onto the array from
above, and the Snap-Fly links rotated in and locked into place. The Center Link of the Flying Cradle
or Frame is connected to the Center Rail of the uppermost Galeo S unit with a Link Pin in the up-
permost hole in the Center Rail. Pay attention that the Snap-Fly links are properly locked in to the
front links of the component above such that they sit flush to the side of the cabinet and are not
standing out of the side surface.
7.3
Flying and securing the Galeo S
The Galeo S system is flown using an appropriate shackle (up to 1.5 t) mounted to the load adapt-
er. The shackle is hung using appropriate lifting accessories (steelflex, sling, chain hoist, winch,
etc.). All relevant safety regulations that are customary in the country must be observed at all
times.
The system is additionally secured using a non-
flammable safety cable (e.g. steel cable, chain) with
sufficient load bearing capacity. This material must
also meet the requirements of all relevant safety regu-
lations. The Flying Frame has a hole in each side rail
which will accept shackles for this purpose. When
using the Flying Cradle, the safety cable should be
secured with a second load adapter or with 2 M10 eye
screws mounted in the flying points on the uppermost
Galeo S element.