background image

 Galeo S / Galeo S Sub 

4 Components of the system 

 

 

 

 

 

 

 

 

 

 

 

4.3

 

Galeo S (Line Array mid-high unit) 

4.3.1

 

Cabinet 

 

Position 

Name 

Description 

Snap-Fly Links 

Two  locking  connecting  links  to  mount  the  Galeo S  unit  to  the  Flying 

Frame or to the next Galeo S unit above 

Front Links 

Counter piece to the Snap-Fly links [A]; Connected to the Flying Frame 

from above in stacked application 

Center Link 

For rear connection to the next lower  Galeo S unit or for connection to 

the perforated rail of the Flying Frame in stacked application; Is extend-

ed to the maximum length in the transport position and is getting locked 

to the desired length when in use 

Auto-Locking Hook 

Two  hooks  that  latch  alternately  in  to  the  Center  Link  [C]  to  take  the 

load in a curved array 

Indexed Center Rails 

Perforated rail with 16 holes for the Stop Pin [F] to pre-select the splay 

angle  between  0°  and  15°  in  one  degree  steps.  For  a  16°  angle,  the 

Stop Pin [F] is not inserted. Additional hole at the top of the rail is for the 

Link Pin [G] 

Stop Pin 

Stop ball-lock pin 6x20 mm with T-handle; Pin is  inserted in the lowest 

hole of the perforated rail [E] for transport; Is being plugged (without any 

load  on  it)  in  the  position  of  the  desired  splay  angle  to  the  next  lower 

Galeo S unit 

Link Pin 

Link  ball-lock  pin  6x20 mm  with  T-handle;  Pin  is  inserted  in  the  upper-

most hole of the perforated rail [E]; For connection to the Center Link of 

the Galeo S unit above respectively to a Flying Frame 

Содержание Galeo S

Страница 1: ...User Manual Galeo S Galeo S Sub Version 1 3 31 07 2020 ...

Страница 2: ...MR Panels 10 4 4 Galeo S Sub flyable subwoofer 11 4 5 Definition of the pin point for the load adapter 12 5 Permitted loads 13 5 1 Galeo S with Galeo S Flying Cradle 13 5 2 Galeo S stacked on a Flying Cradle 13 5 3 Galeo S and Galeo S Sub with Galeo S Flying Frame 14 5 4 Weight overview 15 6 Transport and preparation 16 6 1 Transport in Galeo S Galeo S Sub dolly 16 6 2 General preparations and che...

Страница 3: ...units under flown Galeo S Sub units 22 7 8 Mounting the Galeo S Flying Cradle on a speaker pole 22 7 9 Usage groundstacked on Flying Cradle or Flying Frame 23 7 10 De rigging the array and preparing for transport 25 7 11 Setting up Galeo S Subs Cardioid Presets 25 8 Care and maintenance 27 8 1 Protection against corrosion 27 8 2 Regular inspections 27 9 Recommended amplifiers and controller setups...

Страница 4: ...o S Sub is a compact sized 1x 15 subwoofer with a power handling capacity of 1000 Watt AES and 3000 W Peak It features integrated flying hardware and two M20 threaded sock ets for mounting speaker poles Keep this manual in a safe place so that it is quickly available if there are any questions Provide the user e g Stage Hand with a copy or the digital version of it You can find the current version...

Страница 5: ... damage or destroy magnetic storage devices The PowerCon loop through connector is under power when the device is in operation Observe all relevant safety regulations at all times General safety precautions Make sure that every user of the products concerned has read and understood this manual completely The installation and de rigging of this equipment should only be carried out by appropriately ...

Страница 6: ... and the connector panel can reach temperatures exceeding 40 C The components of the rigging system described here Flying Frame ball lock pins load adapter are only to be used with SEEBURG Galeo S and Galeo S Sub systems in the manner described here specified normal use Make sure that the limit loads specified in this manual are not ex ceeded and also that the suspension points are intended for th...

Страница 7: ...ked in here In stacked application the Galeo S is to be mounted from above and locked with Locking Pins D Center Link Retractable link to connect the uppermost Galeo S unit Parking posi tion is locked with the spare pin E Load Adapter Symmetrical load adapter which is being mounted between the perfo rated profile rails B by using Locking Pins G Alternatively a Clamp Adapter Art 01313 can be used F...

Страница 8: ...ct the uppermost Galeo S unit Parking posi tion is locked with the spare pin E Rear Links Rear link points The rear Snap Fly connectors of the Galeo S Sub unit are locked in here F Snap Fly Links Four locking connecting links to mount the Flying Frame under flown Galeo S Sub respectively for stacking Galeo S on top of Galeo S Sub G Locking Pins Three ball lock pins 6x20 mm with T handle For mounti...

Страница 9: ...gth when in use D Auto Locking Hook Two hooks that latch alternately in to the Center Link C to take the load in a curved array E Indexed Center Rails Perforated rail with 16 holes for the Stop Pin F to pre select the splay angle between 0 and 15 in one degree steps For a 16 angle the Stop Pin F is not inserted Additional hole at the top of the rail is for the Link Pin G F Stop Pin Stop ball lock ...

Страница 10: ...for the mid range and horn guidance for the high range is achieved The Galeo S is delivered as standard with horn elements Art 08141 100 that provide uniform horizontal coverage over 100 By replac ing the 100 panels with covers with a 70 Art 08141 70 horn function the nominal coverage can be changed accordingly This change is particularly appropriate for the uppermost elements of an array where th...

Страница 11: ...y Links Four locking connecting links to mount the Galeo S Sub to the Galeo S Flying Frame or to the next Galeo S Sub above B Front Rear Links Counter piece to the Snap Fly links A held in the parking position for transport with magnets front and rear position of the links is symmet rical for flying cardioids sub arrays ...

Страница 12: ...cting the Flying Frame to a chain hoist or winch is constructed symmet rically to prevent confusion The pin point calculated by the simulation software EASE Focus 3 is always the empty hole between the two Locking Pins used to secure the load adapter This hole is consequently always directly below the shackle in the load adapter ...

Страница 13: ...ng the EASE Focus 3 software and use the following table to check whether the combination of the number of elements the pin point and the maximum downtilt is permissible Permitted no of Galeo S units Pinpoint Max downtilt 5 Max downtilt 5 15 Max downtilt 15 30 1 18 20 16 11 19 19 16 11 20 18 16 11 21 17 16 11 22 16 16 11 23 15 16 11 24 15 16 11 25 14 14 11 Example For a flown array of 16 Galeo S u...

Страница 14: ...rmost Galeo S element so therefore the Cradle angle or Frame angle is automatically the vertical angle of the uppermost element subwoofer in the array It is recommended to simulate the desired system configuration using the EASE Focus 3 software and use the following table to check whether the combination of the number of elements the pin point and the maximum downtilt is permissible Permitted no ...

Страница 15: ...02 50 kg 8 110 60 kg 116 00 kg 9 124 10 kg 129 50 kg 10 137 60 kg 143 00 kg 11 151 10 kg 156 50 kg 12 164 60 kg 170 00 kg 13 178 10 kg 183 50 kg 14 191 60 kg 197 00 kg 15 205 10 kg 210 50 kg 16 218 60 kg 224 00 kg 17 232 10 kg 237 50 kg 18 245 60 kg 251 00 kg 19 259 10 kg 264 50 kg 20 272 60 kg 278 00 kg Galeo S Sub No of Galeo S Sub Weight incl Frame 1 41 00 kg 2 74 00 kg 3 107 00 kg 4 140 00 kg ...

Страница 16: ...d prone to tipping over The top cover of the dolly must be secured to the lower part using a ratchet strap Transport of the Galeo S Sub is possible using the wheel boards with cover the single dolly or the double dolly The recommended maximum is 3 Galeo S Subs on a single dolly or 6 on a double dolly Exceeding the recommended maximum may cause the dolly to be unstable and prone to tipping over The...

Страница 17: ...n section 5 of this manual 6 3 Simulation with EASE Focus 3 Use the EASE Focus 3 software to make an acoustic and mechanical simulation of the Galeo S System The software is available for download on our internet site in the download section under software https www seeburg net en downloads The software allows easy simulation of how the Galeo S array must be tilted and angled to provide ideal cove...

Страница 18: ... the vertical angle of the array or the curving can have a very strong influ ence on the quality of the acoustic result General information about using EASE Focus is available in the internet at https focus afmg eu index php fc software en html Simulation example EASE Focus 3 ...

Страница 19: ...ith a Link Pin in the up permost hole in the Center Rail Pay attention that the Snap Fly links are properly locked in to the front links of the component above such that they sit flush to the side of the cabinet and are not standing out of the side surface 7 3 Flying and securing the Galeo S The Galeo S system is flown using an appropriate shackle up to 1 5 t mounted to the load adapt er The shack...

Страница 20: ...elements which specify the splay angles are not under load They can be removed from the 0 position and placed in the position required for the desired splay angle The uppermost Galeo S unit which is connected to the Flying Cradle or Flying Frame always has a splay angle of 0 for mechanical reasons The angles for the rest of the Galeo S units are set by placing the Stop Pin in the hole for the re q...

Страница 21: ...ing the array it is vitally important to check that all of the Auto Locking Hooks have locked in correctly This can be easily seen with a visual inspection If the Auto Locking Hooks have set correctly one of the two hooks on each element will be exactly parallel to the Center Rail Should this not be the case it must be corrected immediately because the load of the lower units is based on a too sma...

Страница 22: ...Galeo S Subs by using a further Galeo S Flying Frame that s mounted under the low est Galeo S Sub The maximum number of flown subwoofers and Galeo S units can be found in the description in section 5 3 For the flown Galeo S Subs it is recommended to use the same controller setup as for the ones on the ground 7 8 Mounting the Galeo S Flying Cradle on a speaker pole On the underside of the Flying Cr...

Страница 23: ...e is mounted between the subwoofer and Galeo S units If a Flying Cradle is used this must be se cured against tipping forward using a ratchet strap Galeo S units stacked on Galeo S Subs via Flying Frame A further stacking option is provided by the Galeo S Stacking Board which can be mounted on the top of any subwoofer using an M20 screw Galeo S units stacked on a subwoofer via Galeo S Stacking Boa...

Страница 24: ...connected to the Flying Frame using the Snap Fly Links on the Frame or to the upper side of the front links of the Flying Cradle using Lock ing Pins To set the maximum possible 7 downtilt for the bottom Galeo S element the Stop Pin on this ele ment must be in the 0 position in the Indexed Centre Rail When the Stop Pin of this Galeo S ele ment is in the 7 position the element has 0 tilt For applica...

Страница 25: ...a ratchet strap 7 11 Setting up Galeo S Subs Cardioid Presets When using Galeo S subs in a cardioid setup it s important the subwoofer that is facing to the rear must be driven using the appropriate controller setup The cross over frequencies for all subwoof ers must be set to the same value The subwoofers must be set up in a 2 1 ratio i e two units fac ing forwards to one facing the rear If only ...

Страница 26: ...ay system 26 Application examples The following illustrations show various constellations of Galeo S Subs in a cardioid application 2x Galeo S Sub stacked 3x Galeo S Sub next to each other on the ground 3x Galeo S Sub stacked 3x Galeo S Sub flown ...

Страница 27: ...t movable parts of the flying hardware are oiled greased This increases the life of the product and also makes the rig ging of the system easier 8 2 Regular inspections With the flying hardware in particular the system must be checked for visible damage e g caused by improper use or external influences before each use Defective parts have to be replaced im mediately Only the perfect condition of t...

Страница 28: ... powerful amplifier variant delivers up to 4x 8 kW by using two Hoellstern Del ta 20 4 For more flexibility the single parts can also be distributed to smaller SD racks Slide Door 19 racks which can be connected to larger units again using overlatch butterflies For example a 4 U SD rack can be equipped with the HDLM 8 the CP 4 4 connection panel and a 2 U power am plifier Use the system racks in a...

Страница 29: ...igh shelf filter at 2 5 kHz is used to achieve this The following table can be used as a guideline for this adjustment The values assume a standard J curve for the array and moderate level Number of Galeo S Units High Shelf boost 3 0 dB 6 2 dB 9 4 dB 12 6 dB 15 8 dB Note At higher sound pressure levels less HF boost should be used 9 2 2 Galeo S Sub We recommend the preset Galeo S Sub 100 Hz for th...

Страница 30: ...6 100 version 70 x 16 70 version Max Splay Angle 16 Connectors 2 x Neutrik Speakon NL4MP in out Coding 1 HiMid 2 loop thru Handles 2 x Rigging Fittings 2 x M10 Integrated Flying Hardware Weight 13 5 kg Size height x width x depth 19 0 x 45 0 x 38 5 cm Order No 00450 100 100 version 00450 70 70 version The technical data sheet and further information about possible applications for the system and a...

Страница 31: ...kon NL4MP in out Coding 1 loop thru 2 Sub Handles 4 x Fittings M20 on top and side Wheelboard fittings Integrated flying hardware Weight 33 kg 7 kg wheelboard Size height x width x depth 56 0 x 45 0 x 60 0 cm Order No 00460 The technical data sheet and further information about possible applications for the system and available accessories can be downloaded at the following Internet addresses http...

Страница 32: ... DIN EN ISO 12 100 Declared by Winfried Seeburg SEEBURG acoustic line GmbH Place and date Senden 01 01 2018 Legally binding sign ____________________________________________ The attachments constitute part of this declaration This declaration certifies conformity with the listed guidelines but does not guarantee any product characteristics The safety precautions listed in the product documentation...

Страница 33: ...URG acoustic line Produkte sind nur für den gewerblichen Einsatz bestimmt All specifications are current at the time of publishing but are subject to change SEEBURG acoustic line Produktions und Vertriebs GmbH Auweg 32 D 089250 Senden Freudenegg Fon 49 0 7307 97 00 0 Fax 49 0 7307 97 00 29 www seeburg net info seeburg net ...

Отзывы: