Section 04 FUEL SYSTEM
Subsection 03 (FUEL TANK AND FUEL PUMP)
529036166
Set multimeter to
and test pump circuit as per
following table.
PUMP CIRCUIT TEST THROUGH FUEL PUMP
TEST PROBES
RESISTANCE @
20°C (68°F)
Fuse box #1
terminal C1
ECM
connector B
pin B-M1
Approx. 12
smr2009-030-015_g
If test succeeded, the fuel pump and its wiring
harness are good.
If test failed, test wiring continuity as per table.
FUEL PUMP HARNESS CONTINUITY
TEST (WIRING ONLY)
TEST PROBES
RESISTANCE @
20°C (68°F)
Pump harness
connector pin B
Fuse box #1
terminal C1
Pump harness
connector pin A
ECM
connector B
pin B-M1
Close to 0
(continuity)
smr2009-031-021_a
smr2009-031-021_b
Repair or replace wiring as required.
If every test succeeded and fuel pump still does
not work, try a new ECM. Refer to
ELECTRONIC
FUEL INJECTION
subsection.
Fuel Pump Removal
Release fuel pressure. Refer to
FUEL PUMP
in
this subsection.
Open front storage compartment cover and re-
move storage bin.
NOTE:
Removing dashboard may help to give
some light on the working area.
Remove front ventilation box.
266
smr2009-031
Содержание GTX Limited iS 255 2009
Страница 1: ......
Страница 2: ...2009 Shop Manual RXT iS 255 GTX LIMITED iS 255 ...
Страница 23: ...XX smr2009 011 ...
Страница 27: ...4 ...
Страница 29: ...6 ...
Страница 33: ...10 ...
Страница 37: ...14 ...
Страница 47: ...24 ...
Страница 53: ...30 ...
Страница 59: ...36 ...
Страница 81: ...58 ...
Страница 107: ...84 ...
Страница 171: ...148 ...
Страница 195: ...172 ...
Страница 209: ...186 ...
Страница 235: ...212 ...
Страница 275: ...252 ...
Страница 303: ...280 ...
Страница 319: ...296 ...
Страница 335: ...312 ...
Страница 381: ...358 ...
Страница 395: ...372 ...
Страница 449: ...426 ...
Страница 489: ...466 ...
Страница 551: ......
Страница 552: ...NOTES ...
Страница 553: ...NOTES ...
Страница 554: ...2009 Sea Doo 4 TEC iTC iS Series RXT iS 255 GTX Limited iS 255 smr2009 045 001 ...
Страница 555: ...IGNITION SYSTEM CHARGING SYSTEM STARTING SYSTEM smr2009 045 002 ...