Rolling screen installation and operation manual
ENGLISH
Made by Adeo Screen Sp. Z o.o. (Poland) Specifications are subject to change without notice. E&OE
Please verify that you are working with the latest revision of this document before specifying your screen.
Doc: SLMF
–
Installation Manual rev1 | 20.07.2018
Page 14
10 END STOP MOTOR ADJUSTMENT
WARNING - READ CAREFULLY BEFORE PERFORMING ADJUSTMENTS
Adjustments shown must be performed by authorised and specialised personnel only. Incorrect performance of the procedures described may result in damages to the product which
will not be covered by guarantee.
ATTENTION: while performing the procedures described in this manual please pay attention to the icons below:
Unplug the motor of the masking identified with this icon
Do not unplug the motor of the masking identified with this icon
WARNING
End stop is adjusted so as to allow the mask sheet to wind around the roller at least 1.5 times to avoid the sheet coming loose. Incorrect adjustment of end stops can cause:
-Mask coming away from the roller
-Mask winding the wrong way, with ensuing damage to flatness of the masking surface and to winding mechanisms
-
Excessive strain on motor with possible ensuing damage and activation of motor’s thermal resistance
-Excessive winding of the end stop adjustment system with ensuing breaking of the mechanical part
WARRANTY
Operators are reminded that in cases where seals have been tampered with and where any damages have resulted from incorrect adjustment, repair interventions shall not be covered by guarantee.
OPERATIONAL and PROGRAMMING LOGICS
MASTER remote: must be used by technical staff; it enables the memorization of upper, lower and intermediate end stops of the
two individual maskings
Telecomando PILOT: keys 1-5 can be used to memorize additional formats.
Keys 6 open the fabrics 10 cm for the installation (as set by default).
Keys
-STOP-
open and close completely the fabric and the mask (as set by default).
Before you start to programme the MULTIFORMAT motors, in order to avoid misunderstandings and issues during the
performance of the set-up procedures it is important to understand certain operational logics.
The correct sequence of the programming is:
1. tuning of remote controls (supplied with factory setting);
2. setting of maximum and minimum possible opening of maskings (supplied with factory setting);
3. programming of formats, up to a total of 6 (check the variants of your model to see which have default settings and which
don’t).
- Each programming procedure consists of several steps; at the end of each step, the operator has 60 seconds to start the next
step; this system is devised to prevent the risk of performing operations other than those desired. Therefore, if the motor does
not perform the operation exactly as indicated in the instructions, wait 60 seconds, then exit programming and start the
procedure all over again.
-During the performance of any procedure, the push-button must be kept pressed until the response movement of the motor is
completed.
Before carrying out any programming you need to match the master remote to the two individual rollers: the
keys of the left-hand group control the movement of the bottom masking, while the keys of the
right-hand group control the top masking. Should the remote not carry out the above movements, reset the remote as follows:
MASTER REMOTE TO PROJECTION SURFACE (procedures already carried out in factory SHOULD NOT be performed by unauthorised personnel)