
54
MONTHLY or every 100 cycles
Drain and clean both water reservoirs. Remove
and clean both reservoir filters.
Inspect and clean the 3 chamber filters
Clean the external distilled water tank - if installed
Clean the chamber rack and trays
EVERY 6 MONTHS or 500 cycles
(Message appears at intervals)
Perform all the cleaning tasks listed in the monthly
schedule above.
Replace the bacteriological filter
Replace the door seal
TECHNICIAN
EVERY YEAR or 1,000 CYCLES
A complete maintenance of the autoclave
including testing of the pressure relief valve and
the power failure pressure/vacuum relief valve (by
a SciCan-approved technician) is recommended.
Содержание STATCLAVE G4
Страница 5: ...5 Diagram of key systems and components...
Страница 6: ...6...
Страница 17: ...17 Checking package contents...
Страница 18: ...18 Positioning a unit Unit dimensions and operating environment...
Страница 20: ...20 Direct to drain connection recommended...
Страница 21: ...21 Connecting to a waste bottle...
Страница 22: ...22 Connecting to the Internet Connecting to a wired network Connecting to a wireless network...
Страница 23: ...23...
Страница 25: ...25 Connecting an auxiliary pump...
Страница 28: ...28...
Страница 30: ...30 Starting and stopping a cycle...
Страница 50: ...50 Registering for online access...
Страница 51: ...51 First start up...
Страница 52: ...52...
Страница 58: ...58 Draining the unit for cleaning and shipping...
Страница 61: ...61 Replacing the bacteriological filter Replacing the door seal...
Страница 75: ...75...
Страница 107: ...107 APPENDIX A STATCLAVE G4 plumbing diagram...
Страница 108: ...108 APPENDIX B STATCLAVE G4 electrical schematic...