
35
Blower for Heat Exchanger:
ON
Cooling Pump:
ON
VVC:
CLOSED
4.
PRESSURE PULSE (phase included only on some cycles)
Band Heaters:
OFF (ON as required)
Water Pump and VFB:
ON as required
Steam Generator:
ON
VDB:
CLOSED
VEC:
OPEN
Venturi Pump and VEV:
ON
Blower for Heat Exchanger:
ON
Cooling Pump:
ON
VVC:
CLOSED
5.
VACUUM DRAW/ PULSE (phase included only on some cycles)
Band Heaters:
OFF
Water Pump and VFB:
OFF
Steam Generator:
OFF
VDB:
CLOSED
VEC:
OPEN
Venturi Pump and VEV:
ON
Blower for Heat Exchanger:
ON
Cooling Pump:
ON
VVC:
CLOSED
6.
PRESSURIZING
Band Heaters:
OFF (ON as required)
Water Pump and VFB:
ON as required
Steam Generator:
ON
VDB:
CLOSED
VEC:
CLOSED
Venturi Pump and VEV:
OFF
Blower for Heat Exchanger:
ON
Cooling Pump:
ON
VVC:
CLOSED
7.
STERILIZING
Band Heaters:
OFF
Water Pump and VFB:
OFF
Содержание STATCLAVE G4
Страница 5: ...5 Diagram of key systems and components...
Страница 6: ...6...
Страница 17: ...17 Checking package contents...
Страница 18: ...18 Positioning a unit Unit dimensions and operating environment...
Страница 20: ...20 Direct to drain connection recommended...
Страница 21: ...21 Connecting to a waste bottle...
Страница 22: ...22 Connecting to the Internet Connecting to a wired network Connecting to a wireless network...
Страница 23: ...23...
Страница 25: ...25 Connecting an auxiliary pump...
Страница 28: ...28...
Страница 30: ...30 Starting and stopping a cycle...
Страница 50: ...50 Registering for online access...
Страница 51: ...51 First start up...
Страница 52: ...52...
Страница 58: ...58 Draining the unit for cleaning and shipping...
Страница 61: ...61 Replacing the bacteriological filter Replacing the door seal...
Страница 75: ...75...
Страница 107: ...107 APPENDIX A STATCLAVE G4 plumbing diagram...
Страница 108: ...108 APPENDIX B STATCLAVE G4 electrical schematic...