SY265C LC/SY265C LR Excavator OMM
5-104
Operation and Maintenance Manual — 0420
SANY
Swing Gear
1. Prepare the machine for service. See “Maintenance
2. Grease the swing gear fitting (1).
Boom Pins
1. Prepare the machine for service. See “Maintenance
2. Grease the two boom pin grease fittings (1).
Boom Cylinder Rod End
1. Prepare the machine for service. See “Maintenance
2. Grease the two boom cylinder rod end pin grease
fittings (2).
Fig. 5-141
1
0005217
Fig. 5-142
0005216
1
Fig. 5-143
0005216
1