SY265C LC/SY265C LR Excavator OMM
4-62
Operation and Maintenance Manual — 0420
SANY
8. Set the hydraulic lockout control lever to the unlocked
(open) position (6).
9. Raise the work equipment to clear the trailer.
10. Lower the bucket and move slowly down the ramp
while operating the boom and arm inward to provide
support as the machine moves forward off the ramp.
11. Park the machine at the desired location.
12. Run the engine at low idle (approximately 1050 rpm)
for 5 minutes.
13. Shut down the engine, remove the key from the switch, and turn the battery disconnect switch to off.
Lift the Machine
To lift the machine on or off a trailer, use the lift/tie-down
points (2) identified on both sides of the machine, as well as
the center of gravity point (1) on both sides of the machine.
NOTICE!
Never turn the battery disconnect switch to OFF while the engine is running. This can damage
the electrical system or cause the machine to operate improperly.
After machine shutdown, wait at least 2 minutes for the Engine Control Module (ECM) to
complete its shutdown before turning the battery disconnect switch to OFF.
Failure to follow this notice could damage the machine or cause it to operate improperly.
Fig. 4-90
0005235
6
Fig. 4-91
0000106
Fig. 4-92
0004381
2
1