SY265C LC/SY265C LR Excavator OMM
SANY
Operation and Maintenance Manual — 0420
5-87
TABL
E OF
CONT
E
N
TS
INTRODUCTION
SAFE
T
Y
MACHIN
E
CONTROLS
MACHINE
OP
ERA
T
IO
N
MA
INTENANCE
SPEC
IFI
CA
TIO
N
S
OP
T
IO
N
A
L
EQUI
PMENT
Final Drive
Check the Final Drive
NOTE:
Perform this procedure after the first 50 hours
or week of service, then every 500 hours or 3
months afterwards.
1. Prepare the machine for service. See “Maintenance
2. Relieve hydraulic system pressure. See “Relieve
Hydraulic System Pressure” on page 5-67.
3. Remove fasteners (2) and the final drive cover (1).
4. Inspect the travel motor (3) to make sure all hoses are
secured.
5. Check for leaks.
6. Make sure all fasteners (4), including the final drive
motor mounting fasteners, are present and tight.
7. Replace any damaged or defective fasteners and
tighten any loose fasteners.
NOTE:
Use anaerobic thread sealant when installing
loose fasteners and installing new fasteners.
Tighten fasteners securely.
8. Check the final drive oil level. See “Check the Final Drive Oil Level” on page 5-88.
9. Install the final drive cover.
10. Repeat steps for the final drive on the opposite side.
Fig. 5-116
0004744
2
1
Fig. 5-117
0000157
3
4