SY265C LC/SY265C LR Excavator OMM
5-32
Operation and Maintenance Manual — 0420
SANY
Replace the Crankcase Breather
1. Prepare the machine for service. See “Maintenance
2. Open the engine compartment door. See “Engine
Compartment Door” on page 4-11.
3. Clean the crankcase breather cover (1).
NOTICE!
• Make sure the battery disconnect switch is OFF before removing the crankcase breather.
• Never turn the battery disconnect switch to OFF while the engine is running. This can
damage the electrical system or cause the machine to operate improperly.
• After machine shutdown, wait at least 2 minutes for the engine control module (ECM) to
complete its shutdown before turning the battery disconnect switch to OFF.
Failure to follow this notice could cause damage to the machine or cause it to operate
improperly.
Fig. 5-22
0005314
1