SY265C LC/SY265C LR Excavator OMM
SANY
Operation and Maintenance Manual — 0420
4-15
TA
BLE OF
CO
NTENTS
INTRODUCTION
SA
FE
T
Y
MA
CHINE
CONTROLS
MA
CHINE
OPERA
T
ION
MAINTEN
ANCE
SPECI
FICA
TIONS
OPTIONAL
EQUIP
M
ENT
NEW MACHINE BREAK-IN
1. Stat the engine and run at low idle until it reaches proper operating temperature. Do not move the controls.
2. Avoid operating the machine under heavy loads or at high speeds during the break-in period. Operate as much
as possible in the 1/2 to 3/4 throttle or load range. Do not operate this machine with a full load during the
break-in period.
3. Avoid sudden starts, movements, or stops, except in an emergency.
4. Monitor the instruments frequently – especially the engine oil pressure and engine coolant temperature.
5. Avoid operating the engine at low idle for extended periods of time.
6. Manage engine power to allow acceleration to governed speed when conditions require more power. Do not
over-rev the engine.
7. Always allow the engine to cool before shutting it down.
8. After shutting down the engine, check all fluid levels.
NOTICE!
The machine has been throughly tested and adjusted before shipment. However, initial
operation of the machine under severe conditions can adversely affect the performance of the
machine or shorten the machine life. SANY recommends a break-in period of 100 service
hours for a new machine. Properly break in a new machine is crucial for a long service life by
allowing time for internal engine parts to break in.