![Samsung LH080XPRZAS/PZ Скачать руководство пользователя страница 58](http://html.mh-extra.com/html/samsung/lh080xprzas-pz/lh080xprzas-pz_installation-manual_342563058.webp)
2. Installation : Cable Connections ③ PDS to PDS
58
• PDS Board to PDS Board (Group1)
- ①
Serial connection (RJ45, LAN Cable connection) (VG-XACP8KIT/ENCP)
: For PDS boards that send data, connect the cables to OUT on the boards.
For PDS boards that receive data, connect the cables to IN on the boards, as shown below.
1 cabinet
OUT
IN
PDS 1
PDS 2
PDS 1
PDS 2
RJ45,LAN cable
Содержание LH080XPRZAS/PZ
Страница 1: ...Outdoor LED Installation Manual XPR Series Standard Cabinet LH080XPRZAS PZ Rev 0 9 ...
Страница 7: ... Standard Cabinet Outside 1 Product Information Standard Cabinet 7 Front Rear ...
Страница 128: ...4 Control Room Setting System Matrix 128 System Matrix basic function Diagnostics Module 진단 상태 확인 ...