2. Installation : Handling Cabinets
28
④ ④ ⑤
⑤
Tighten the bolts between the bottom of the cabinet and the brackets
on the cabinet below.
M8 L18 BOLT
Lowest of section
Y seam
Tighten the two cabinets directly from inside the cabinet with bolts.
(doors open) At the same time, adjust the Z-seam based on the
LED modules on the front.
M8 L18 BOLT
④
Cabinet to be
extended
Cabinet to be
extended
⑤
Repeat steps 1 and 2 for the other three cabinets.
Содержание LH080XPRZAS/PZ
Страница 1: ...Outdoor LED Installation Manual XPR Series Standard Cabinet LH080XPRZAS PZ Rev 0 9 ...
Страница 7: ... Standard Cabinet Outside 1 Product Information Standard Cabinet 7 Front Rear ...
Страница 128: ...4 Control Room Setting System Matrix 128 System Matrix basic function Diagnostics Module 진단 상태 확인 ...