2. Installation : Cable Connections ③ PDS to PDS
59
• PDS Board to PDS Board (Group1)
-
②
Serial connection (RJ45, LAN Cable connection)
: For cabinets connected to Group1, connect LAN cables to OUT on the PDS boards that send data and to
IN on the PDS boards that receive data, as shown in
①
.
ZONE
Group1
…
…
OUT
IN
OUT
IN
OUT
IN
OUT
IN
OUT
IN
OUT
IN
Start
End
Содержание LH080XPRZAS/PZ
Страница 1: ...Outdoor LED Installation Manual XPR Series Standard Cabinet LH080XPRZAS PZ Rev 0 9 ...
Страница 7: ... Standard Cabinet Outside 1 Product Information Standard Cabinet 7 Front Rear ...
Страница 128: ...4 Control Room Setting System Matrix 128 System Matrix basic function Diagnostics Module 진단 상태 확인 ...