2. Installation : Mounting Cabinets (Front installation)
Hang one more cabinet/section while adjusting X seam
based on the cabinet below.
And disassemble some LED modules as shown.
Y seam
M8 L18 BOLT
33
M8 BOLT + NUT
M8 BOLT + NUT
③
③
③
Tighten the two cabinets/section directly from inside the cabinet with bolts.
(doors open) At the same time, adjust the Z-seam based on the LED modules.
And
Reassemble the LED modules
Tighten the top every brackets to the L-shaped steel assembled on the H beam.
Upward extension
cabinet/section
Содержание LH080XPRZAS/PZ
Страница 1: ...Outdoor LED Installation Manual XPR Series Standard Cabinet LH080XPRZAS PZ Rev 0 9 ...
Страница 7: ... Standard Cabinet Outside 1 Product Information Standard Cabinet 7 Front Rear ...
Страница 128: ...4 Control Room Setting System Matrix 128 System Matrix basic function Diagnostics Module 진단 상태 확인 ...