22
2. Installation
◇
Pre work on ground – Install the fan on every 5
th
lines (intake, Exhaust)
(P23 ~ P24)
Ex) FHD Zone Screen : 1 cabinet : to work on
Intake Fan/Internal Fan
Exhaust Fan
Exhaust Fan
Intake Fan/Internal Fan
※
Install every fifth line, but if the screen is not a multiple of 5, install it at the top of screen ( )
Содержание LH080XPRZAS/PZ
Страница 1: ...Outdoor LED Installation Manual XPR Series Standard Cabinet LH080XPRZAS PZ Rev 0 9 ...
Страница 7: ... Standard Cabinet Outside 1 Product Information Standard Cabinet 7 Front Rear ...
Страница 128: ...4 Control Room Setting System Matrix 128 System Matrix basic function Diagnostics Module 진단 상태 확인 ...