![Samsung LH080XPRZAS/PZ Скачать руководство пользователя страница 35](http://html.mh-extra.com/html/samsung/lh080xprzas-pz/lh080xprzas-pz_installation-manual_342563035.webp)
B’d, Cable install flow
- Install B ’ d and cable in the following order.
2. Installation
35
Y8 Assembly
. Y8 Address Setting
Signal B’d Assembly
Cable Connection
. ① Y8 to Module
. ② Y8 to Y8
. ③ PDS to PDS
(B’d ID setting)
. ④ Signal B’d to Y8 , PDS
Power Connection
EXHAUST FAN
Signal B’d
EXHAUST FAN EXHAUST FAN
Y8
Y8
(Redundancy)
INTAKE FAN
INTERNAL FAN
INTAKE FAN
INTERNAL FAN
INTAKE FAN
INTERNAL FAN
Содержание LH080XPRZAS/PZ
Страница 1: ...Outdoor LED Installation Manual XPR Series Standard Cabinet LH080XPRZAS PZ Rev 0 9 ...
Страница 7: ... Standard Cabinet Outside 1 Product Information Standard Cabinet 7 Front Rear ...
Страница 128: ...4 Control Room Setting System Matrix 128 System Matrix basic function Diagnostics Module 진단 상태 확인 ...