2. Installation : Mounting Cabinets (Front installation)
1st cabinet/section
Hang one more cabinet/section and attach it to the next cabinet/section
And disassemble some LED modules as shown.
C
B
N
C
B
N
Z seam
M8 L18 BOLT
X seam
M8 BOLT + NUT
M8 BOLT + NUT
32
M8 BOLT + NUT
M8 BOLT + NUT
①
①
①
②
②
②
Hang the Brackets of cabinet/section corner on the frame.
Tighten the top every brackets to the L-shaped steel assembled on the H beam.
Tighten the two cabinets/sections directly from inside the cabinet with bolts.
(doors open) At the same time, adjust the Z-seam based on the LED modules.
And
Reassemble the LED modules
Tighten the top every brackets to the L-shaped steel assembled on the H beam.
Lateral cabinet / section
1st cabinet/section
Содержание LH080XPRZAS/PZ
Страница 1: ...Outdoor LED Installation Manual XPR Series Standard Cabinet LH080XPRZAS PZ Rev 0 9 ...
Страница 7: ... Standard Cabinet Outside 1 Product Information Standard Cabinet 7 Front Rear ...
Страница 128: ...4 Control Room Setting System Matrix 128 System Matrix basic function Diagnostics Module 진단 상태 확인 ...