LIFT MODEL VISION AS 300 Rev001
8-4
To operate the lift see the chapter of OPERATION
Load the elevator car making sure that:
• loads are compatible to the of use of the lift
• the load has been firmly secured and uniformly distributed in the
cabin
• the load has been firmly secured in the cabin
• after the operations of loading, the access doors must be
regularly closed
ATTENTION:
In case of an emergency, for which the immediate stop of the lift
were required, press the red STOP push-button fitted on the control
panel!
Rise with cabin to the desired floor then open the first door of the cabin and next the landing
door to access at the floor
NOTE: when the door is open, the elevator cannot be operated because the electric
limit switch prevents its starting.
When the height required is reached, carry out the operations of loading and unloading.
Close the sliding doors.
The elevator is free to move.
NOTE: Be sure not to carry out maneuvers of sudden reverses in order to avoid
useless stresses to the mechanical parts.
8.5
Disabling of the hoist
Lower the cabin to ground level.
disconnect the main cut-out switch fitted on the panel (turn into the "0" position).
remove the feeding cable.
adopt all the precautions to preclude the use of the elevator to unauthorised persons.
NOTE: In all these cases, when the use of the hoist is forbidden, at the end of the
working time and anyway, during the periods of non-use (with the structure
mounted), the elevator must necessarily be disabled following the
procedure here below.
8.6
Centrifugal parachute brake
ATTENTION:
The parachute brake is supplied by the manufacturer with its
protection sealed which for any reason must not be tampered!
Содержание VISION AS 300
Страница 2: ......
Страница 4: ......
Страница 43: ...LIFT MODEL VISION AS 300 Rev001 7 4 Fig 7 1 Dimension...
Страница 68: ...LIFT MODEL VISION AS 300 Rev001 12 1 12 WIRING DIAGRAMS Fig 12 1 Wiring diagram Power supply...
Страница 69: ...LIFT MODEL VISION AS 300 Rev001 12 1 Fig 12 2 Wiring diagram Motor power supply...
Страница 70: ...LIFT MODEL VISION AS 300 Rev001 12 2 Fig 12 3 Wiring diagram Emergency circuit...
Страница 71: ...LIFT MODEL VISION AS 300 Rev001 12 3 Fig 12 4 Wiring diagram Auxiliary...
Страница 72: ...LIFT MODEL VISION AS 300 Rev001 12 4 Fig 12 5 4 Wiring diagram Auxiliary PLC logo expans...
Страница 73: ...LIFT MODEL VISION AS 300 Rev001 12 5 Fig 12 6 Auxiliary circuit...
Страница 74: ...LIFT MODEL VISION AS 300 Rev001 12 6 Fig 12 7 Wiring diagram Connectors C1 C2 C3...
Страница 75: ...LIFT MODEL VISION AS 300 Rev001 12 7 Fig 12 8 Wiring diagram Terminal box electric panel...
Страница 76: ...LIFT MODEL VISION AS 300 Rev001 12 8 Fig 12 9 Wiring diagram Cable call floor...
Страница 77: ...LIFT MODEL VISION AS 300 Rev001 12 9 Fig 12 10 Wiring diagram Floors call connection...
Страница 78: ...LIFT MODEL VISION AS 300 Rev001 12 10 Fig 12 11 Wiring diagram Box floor call connection...
Страница 79: ...LIFT MODEL VISION AS 300 Rev001 12 11 Fig 12 12 Wiring diagram Box Fencing connection...
Страница 80: ...LIFT MODEL VISION AS 300 Rev001 12 12 Fig 12 13 Wiring diagram Cable fancing call...
Страница 81: ...LIFT MODEL VISION AS 300 Rev001 12 13 Fig 12 14 Main electrical box components...
Страница 82: ...LIFT MODEL VISION AS 300 Rev001 12 14 Fig 12 15 Material list 1...
Страница 83: ...LIFT MODEL VISION AS 300 Rev001 12 15 Fig 12 16 Material list 2...