LIFT MODEL VISION AS 300 Rev001
9-3
ATTENTION:
This operation must be carried out by adequately formed personnel
only.
•
carry out an accurate sight check of the conditions of: painted parts, zinc-plated
parts, welding and verify possible traces of corrosion
•
check pinions and drive rolls fastenings, tighten them if loose.
•
Check for traces of corrosion on the fixing screws of the first
mast
to their bases:
replace the screws in case
•
every two years
•
first of all, carry out the checks stated at point 5
•
Replace the lubricant in the lifting reducers (for the lubricant to use see at table 8:
Lubrification)
ATTENTION:
for the oil replacement, use always the same type of oil used the
previous time: it is not recommended to mix different type of oils.
Do not mix synthetic lubricants with mineral oils.
during storing of the machine
•
carry out a careful and complete inspection of the machine
•
check the conditions of all the parts relevant for the safety
•
clean and grease pinions and racks
•
check the status of the single masts -the connection zones in particular- and the
relevant bolts.
•
Check for traces of corrosion on the fixing screws of the first trestles to their bases:
replace the screws in case.
•
Store the
lift
possibly inside or in a covered area: if impossible, preserve at least the
motors and the electric parts with a tarpaulin.
PART
EVERY WEEK
EVERY 8
MONTHS
PRODUCT
Speed reducer
Check the level
Replace the
oil
????
Braking unit reducer
Check the level
Replace the
oil
????
Pinion and racks
Lubricate
Normal grease
Doors mechanical
locking system
Lubricate
Normal grease
Doors pulleys
Lubricate
Normal grease
Trestles tube plus rack
Lubricate
Normal grease
Lifting pinions
Lubricate
Normal grease
Table 6 : Parts to lubrificate
Содержание VISION AS 300
Страница 2: ......
Страница 4: ......
Страница 43: ...LIFT MODEL VISION AS 300 Rev001 7 4 Fig 7 1 Dimension...
Страница 68: ...LIFT MODEL VISION AS 300 Rev001 12 1 12 WIRING DIAGRAMS Fig 12 1 Wiring diagram Power supply...
Страница 69: ...LIFT MODEL VISION AS 300 Rev001 12 1 Fig 12 2 Wiring diagram Motor power supply...
Страница 70: ...LIFT MODEL VISION AS 300 Rev001 12 2 Fig 12 3 Wiring diagram Emergency circuit...
Страница 71: ...LIFT MODEL VISION AS 300 Rev001 12 3 Fig 12 4 Wiring diagram Auxiliary...
Страница 72: ...LIFT MODEL VISION AS 300 Rev001 12 4 Fig 12 5 4 Wiring diagram Auxiliary PLC logo expans...
Страница 73: ...LIFT MODEL VISION AS 300 Rev001 12 5 Fig 12 6 Auxiliary circuit...
Страница 74: ...LIFT MODEL VISION AS 300 Rev001 12 6 Fig 12 7 Wiring diagram Connectors C1 C2 C3...
Страница 75: ...LIFT MODEL VISION AS 300 Rev001 12 7 Fig 12 8 Wiring diagram Terminal box electric panel...
Страница 76: ...LIFT MODEL VISION AS 300 Rev001 12 8 Fig 12 9 Wiring diagram Cable call floor...
Страница 77: ...LIFT MODEL VISION AS 300 Rev001 12 9 Fig 12 10 Wiring diagram Floors call connection...
Страница 78: ...LIFT MODEL VISION AS 300 Rev001 12 10 Fig 12 11 Wiring diagram Box floor call connection...
Страница 79: ...LIFT MODEL VISION AS 300 Rev001 12 11 Fig 12 12 Wiring diagram Box Fencing connection...
Страница 80: ...LIFT MODEL VISION AS 300 Rev001 12 12 Fig 12 13 Wiring diagram Cable fancing call...
Страница 81: ...LIFT MODEL VISION AS 300 Rev001 12 13 Fig 12 14 Main electrical box components...
Страница 82: ...LIFT MODEL VISION AS 300 Rev001 12 14 Fig 12 15 Material list 1...
Страница 83: ...LIFT MODEL VISION AS 300 Rev001 12 15 Fig 12 16 Material list 2...