LIFT MODEL VISION AS 300 Rev001
2-1
2
SAFETY PLAN FOR BUILDING SITE LIFTS
2.1
Identification, analysis and evaluation of possible risks
The list here below (EN 12159/2000) contains a list of risks to eliminate or reduce as they could
come up during the various installation stages of the equipment operating life:
1. Fall of a worker from height to ground
2. Fall of material from height to ground
3. Electric shock from bad wiring
4. Mechanical risks
•
Clamping
•
Cutting off
•
Impact
•
Expulsion of parts
•
Losing of steadiness
•
Sliding, tripping and fall
5. Risk caused by electrical failure
6. Electric contact
7. Risks generated by the non-observance of the ergonomic principles while projecting the
machine
8. Dangerous postures or excessive physical efforts
9. Human error
10. Combination of risks
11. Electric power failure
12. Overturning, unexpected lose
of the machine steadiness
13. Risks caused by a lack of the safety devices or by their improper positioning
14. Safety guards improper position
15. Start and stop devices improper function
16. Safety warnings posts and signaling problems
17. Energy supply disconnecting devices
improper function
18. Emergency devices in
improper function
19. Equipment and accessories necessary for setting up and maintenance in safety
conditions
20. Risks generated by the movement
21. Unsuitable lighting in the working/
maneuvering
zone
22. Risks generated by sudden movements, by lack of steadiness etc. during the
maneuver
23. Insufficient visibility from the operator position
Special risks generated by the hoisting of people
•
Excessive speed
•
Fall of people from the elevator car
Содержание VISION AS 300
Страница 2: ......
Страница 4: ......
Страница 43: ...LIFT MODEL VISION AS 300 Rev001 7 4 Fig 7 1 Dimension...
Страница 68: ...LIFT MODEL VISION AS 300 Rev001 12 1 12 WIRING DIAGRAMS Fig 12 1 Wiring diagram Power supply...
Страница 69: ...LIFT MODEL VISION AS 300 Rev001 12 1 Fig 12 2 Wiring diagram Motor power supply...
Страница 70: ...LIFT MODEL VISION AS 300 Rev001 12 2 Fig 12 3 Wiring diagram Emergency circuit...
Страница 71: ...LIFT MODEL VISION AS 300 Rev001 12 3 Fig 12 4 Wiring diagram Auxiliary...
Страница 72: ...LIFT MODEL VISION AS 300 Rev001 12 4 Fig 12 5 4 Wiring diagram Auxiliary PLC logo expans...
Страница 73: ...LIFT MODEL VISION AS 300 Rev001 12 5 Fig 12 6 Auxiliary circuit...
Страница 74: ...LIFT MODEL VISION AS 300 Rev001 12 6 Fig 12 7 Wiring diagram Connectors C1 C2 C3...
Страница 75: ...LIFT MODEL VISION AS 300 Rev001 12 7 Fig 12 8 Wiring diagram Terminal box electric panel...
Страница 76: ...LIFT MODEL VISION AS 300 Rev001 12 8 Fig 12 9 Wiring diagram Cable call floor...
Страница 77: ...LIFT MODEL VISION AS 300 Rev001 12 9 Fig 12 10 Wiring diagram Floors call connection...
Страница 78: ...LIFT MODEL VISION AS 300 Rev001 12 10 Fig 12 11 Wiring diagram Box floor call connection...
Страница 79: ...LIFT MODEL VISION AS 300 Rev001 12 11 Fig 12 12 Wiring diagram Box Fencing connection...
Страница 80: ...LIFT MODEL VISION AS 300 Rev001 12 12 Fig 12 13 Wiring diagram Cable fancing call...
Страница 81: ...LIFT MODEL VISION AS 300 Rev001 12 13 Fig 12 14 Main electrical box components...
Страница 82: ...LIFT MODEL VISION AS 300 Rev001 12 14 Fig 12 15 Material list 1...
Страница 83: ...LIFT MODEL VISION AS 300 Rev001 12 15 Fig 12 16 Material list 2...