LIFT MODEL VISION AS 300 Rev001
7-1
7
ERECTION AND DISMANTLING
7.1
Dangerous zones and residual risks during the erection and dismantling
It is a dangerous zone any zone in the proximity to the platform where a person is
exposed to the risk of injuries and damages to his/her health.
During the erection and dismantling of the lift there are some residual risks for the operator. The
residual risks can be eliminated by following carefully the procedures indicated in this manual
and adopting the personal safety devices indicated.
Protective gloves must be worn.
Safety shoes must be used.
The working and safety overalls must be worn.
The safety helmet must be worn.
In case of need safety belts must be used.
Hazardous zones and residual risks during the erection/dismantling
Zone of dismantling/erection of the lift.
The following risks are present here:
• Collision hazard for operator.
• Risk of squashing.
• Falling risk
The operator must use the following DPI:
• Safety helmet.
• Safety shoes.
• Protective gloves.
• Safety belts in case of necessity.
ATTENTION:
SAFI does not assume the responsibility for any injuries to people
and domestic animals nor for any damage to properties which arise
from the non-observance of the precautions given or from the non-
use of the DPI specified.
Содержание VISION AS 300
Страница 2: ......
Страница 4: ......
Страница 43: ...LIFT MODEL VISION AS 300 Rev001 7 4 Fig 7 1 Dimension...
Страница 68: ...LIFT MODEL VISION AS 300 Rev001 12 1 12 WIRING DIAGRAMS Fig 12 1 Wiring diagram Power supply...
Страница 69: ...LIFT MODEL VISION AS 300 Rev001 12 1 Fig 12 2 Wiring diagram Motor power supply...
Страница 70: ...LIFT MODEL VISION AS 300 Rev001 12 2 Fig 12 3 Wiring diagram Emergency circuit...
Страница 71: ...LIFT MODEL VISION AS 300 Rev001 12 3 Fig 12 4 Wiring diagram Auxiliary...
Страница 72: ...LIFT MODEL VISION AS 300 Rev001 12 4 Fig 12 5 4 Wiring diagram Auxiliary PLC logo expans...
Страница 73: ...LIFT MODEL VISION AS 300 Rev001 12 5 Fig 12 6 Auxiliary circuit...
Страница 74: ...LIFT MODEL VISION AS 300 Rev001 12 6 Fig 12 7 Wiring diagram Connectors C1 C2 C3...
Страница 75: ...LIFT MODEL VISION AS 300 Rev001 12 7 Fig 12 8 Wiring diagram Terminal box electric panel...
Страница 76: ...LIFT MODEL VISION AS 300 Rev001 12 8 Fig 12 9 Wiring diagram Cable call floor...
Страница 77: ...LIFT MODEL VISION AS 300 Rev001 12 9 Fig 12 10 Wiring diagram Floors call connection...
Страница 78: ...LIFT MODEL VISION AS 300 Rev001 12 10 Fig 12 11 Wiring diagram Box floor call connection...
Страница 79: ...LIFT MODEL VISION AS 300 Rev001 12 11 Fig 12 12 Wiring diagram Box Fencing connection...
Страница 80: ...LIFT MODEL VISION AS 300 Rev001 12 12 Fig 12 13 Wiring diagram Cable fancing call...
Страница 81: ...LIFT MODEL VISION AS 300 Rev001 12 13 Fig 12 14 Main electrical box components...
Страница 82: ...LIFT MODEL VISION AS 300 Rev001 12 14 Fig 12 15 Material list 1...
Страница 83: ...LIFT MODEL VISION AS 300 Rev001 12 15 Fig 12 16 Material list 2...