R5
SUPREME - Navigation System
CONFIGURATION
7000 118-301, A3
Page 39
4
CONFIGURATION
When the physical and electrical installation of the system is complete, the R5 SUPREME
Navigation System needs to be configured. This chapter describes what the installer is
required to do before the R5 SUPREME Navigation System is fully functional.
4.1
Configuration Wizard
The first time the R5 SUPREME CDU is started, a configuration wizard will be shown. This
wizard is a helpful guide to configure the basic functionality of the R5 SUPREME System.
The following sections describe the different steps in the configuration wizard.
4.1.1
Calibration View
Figure 10
– Calibration View
The first time the R5 SUPREME CDU is used, the touch screen needs to be calibrated.
A cross will be shown on the screen at several locations. Press on the cross each time
it appears to calibrate the touch screen. Try to hit the center of the cross as accurate as
possible for the best possible calibration.
4.1.2
System Setup
Figure 11
– System Setup
The R5 SUPREME CDU can be used in a standalone AIS system, standalone
Navigation system, Combined AIS and Navigation system or be used as a slave
display to an existing R5 Navigation System. The Navigation system can also be in two
Содержание R5 SUPREME AIS
Страница 1: ...OPERATION INSTALLATION MANUAL Saab TransponderTech R5 SUPREME Navigation System ...
Страница 2: ...This page is intentionally empty ...
Страница 60: ...R5 SUPREME Navigation System OPERATION 7000 118 301 A3 Page 60 5 4 System Menus Tree View ...
Страница 103: ...R5 SUPREME Navigation System OPERATION 7000 118 301 A Page 103 Figure 92 Update Software ...
Страница 151: ...R5 SUPREME Navigation System MECHANICAL DRAWINGS 7000 118 301 A Page 151 14 2 CDU Panel Mount Cutout Hole dimensions ...