START-S12
Technical manual
-12-
3
Installation of the control unit
• The control unit is
equipped with a net-
work fi lter
We recommend:
• Install an automatic
switch 10/16A
• Check the network
power: 230 Vac:
-5% +10%
THREE PHASE MOTOR
“DELTA” CONNECTION
M
MF1
MF2
MF3
It is recommended to use
shielded cables
3.1
Connection of the TENSION and MOTOR POWER SUPPLY
It is shown the connection of a
230V
lamp with or
without fl ashing card.
To activate the function lamp in pause TIME, set
S05
as shown:
S 05
LAMP IN PAUSE
1 - Activated
0 - Deactivated
(standard)
•
SET UP OF THE LIGHTING
S12
In case the lamp has no fl ashing card, set
S12
in 1:
FLASHING
1 - Activated
(standard)
0 - Deactivated
•
LAMP IN PAUSE TIME
3.2
Connection of the lamp 230 Vac or 12 Vac
N
L
230 Vac
LAMP
12 V
ac
LAMP
230 V
ac
It is shown the connection of a
12 Vac
lamp with or
without fl ashing card.
3.3
Pre-fl ashing time
It is possible to increase or reduce the time of pre-fl ashing
when the door is closed or open, make as follow with
T07
and
T08
:
t 07
t 08
PRE -FLAS HIN G TIME WHEN
THE DOOR IS CLOSED
From 0 to 10 s
Standard value 0.5 s
PRE-FLASHING TIME
WHEN THE DOOR IS OPEN
From 0 to 10 s
Standard value 2 s
1 2
3
4 5
6 7
6 7
10 11
Содержание START-S12-M
Страница 30: ...START S12 Manuale tecnico 30 10 Note ...
Страница 63: ...START S12 M Technical manual 30 10 Note ...
Страница 95: ...START S12 Technical manual 30 10 Note ...
Страница 128: ...START S12 Instrución 31 10 Note ...
Страница 129: ...START S12 Instrución 32 ...
Страница 130: ...START S12 Instrución 33 ...
Страница 164: ...START S12 Notice d emploi 31 10 Note ...
Страница 165: ...START S12 Notice d emploi 32 ...
Страница 166: ...START S12 Notice d emploi 33 ...