
7.5.1.2.1 Activating drive group management when commissioning for the first time
Prerequisite:
n
The drives are connected to the MultiControl II quadro
1.
Connect the mains cable to the operator's voltage supply.
2.
Setting the language
.
ð
The message
“Please start initialization”
is displayed.
3.
Do not start the initialization run despite the
displayed message.
Press the button to select the main menu
4.
Select the menu via
“Control”
®
“Commissioning”
®
“Configure drive group management”
.
ð
The message
“Specification of drive type for drive group
2”
Fig. 65: Setting the language
Fig. 66: Start the initialization
Selecting drive group management
Fig. 67: Configuring drive group man-
agement
Operating the hand switch with 6 function buttons
Control menu > Commissioning menu
20.08.2021
Control unit RK MultiControl II duo/RK MultiControl II quadro
183
Содержание RK MultiControl II duo
Страница 115: ...Anhang Anhang 20 08 2021 Steuerung RK MultiControl II duo RK MultiControl II quadro 115...
Страница 116: ...Anhang 20 08 2021 Steuerung RK MultiControl II duo RK MultiControl II quadro 116...
Страница 228: ...Appendix Appendix 20 08 2021 Control unit RK MultiControl II duo RK MultiControl II quadro 228...