80
Upgrade and Maintenance Guide
Replacing SteelHead xx50
Components
R
eplacing Memory
7.
Press down on the memory module with your thumbs while pulling up on the ejectors with your index
fingers to lock the module into the slot.
8.
Ensure that all ejector tabs are in the upright locked position.
9.
Repeat Step 3 to Step 7 of this procedure to install the remaining memory modules.
10.
Replace the chassis cover.
Replacing Memory Modules in 3U xx50 Appliances
This section describes how to replace memory modules in 3U appliances. Before you begin you must obtain
the correct replacement memory and slot location from Riverbed Support. Memory modules and slot
locations vary according to the motherboard in your appliance.
Contact Riverbed Support at https://support.riverbed.com to determine the type of memory and slot
location for the motherboard in your appliance.
Note:
When you replace memory modules, you must wear a grounded ESD antistatic strap to protect the hardware
against electrostatic discharge. Make sure that the strap makes skin contact prior to handling equipment. For details,
see
“Electrostatic Discharge Guidelines” on page 8
To remove the appliance cover
1.
Power down the system.
2.
Disconnect the appliance from the electrical outlet and peripherals.
3.
Remove the top cover of the chassis.
To access the memory modules in the Interceptor 9350 appliances, you must remove the appliance cooling
shroud. The following figures illustrate the necessary steps to remove the cooling shroud.
Содержание SteelCentral NetExpress 470
Страница 10: ...10 Upgrade and Maintenance Guide Preface Contacting Riverbed ...
Страница 40: ...40 Upgrade and Maintenance Guide Replacingxx70 Interceptor9600 andSteelFusionCore3500Components Replacing Fans ...
Страница 68: ...68 Upgrade and Maintenance Guide Replacing CX xx55 EX xx60 DX and SteelFusion Core Components Replacing Fans ...
Страница 90: ...90 Upgrade and Maintenance Guide Replacing SteelHead xx50 Components Replacing Fans ...