Inst
alla
tion
Installation: Assembly, connection and start-up
20
* Please note the red mark – see “Bus connections in the door station” on page
.
Circuit diagram:
one or multi-family residence with one main bus line
Starting up
Multi-family and office building with separate floor access door stations
Block diagram:
multi-family and office building with separate floor access door stations.
Operation
Device
1. Switch on
Customer line safety switch
2. Deactivate adjustment protection
1)
1)
Deactivated by the contractor.
TwinBus power supply unit 1 7573
3. Programming the main doorbell
2)
2)
More information can be found in the indoor telephone “Start-up” section starting on page
.
Assign door station and intercoms
4. Program internal call numbers
Intercom units with internal communication
5. Adjust door opening time
TwinBus power supply unit 1 7573, default value 3 s
6. Activate adjustment protection if
required
TwinBus power supply unit 1 7573
RiTTO
4
2
1 7573
2
2
1 4585
1 7573
4
RiTTO
RiTTO
RiTTO
1 4760
1 4751
ED
2
1 7573
4
2
1 7650
1 7650
2
2
RiTTO
RiTTO
1 4760
1 4751
2
2
RiTTO
1 4760
1 4754
1 4754
2
ED
2
1 7630
ED
2
1 7630
ED
2
1 7630
1 7630
ET2
2
1 4585
a1
a2
230 V
230 V
2
230 V
1 7650
1 7650
2
2
ET1
B0016-1
Содержание TWINBUS
Страница 2: ...2 ...
Страница 41: ...Installation Assembly connection and start up 41 Installation 00042 0 ...
Страница 156: ...Installation Installation Assembly connection and start up 156 ...
Страница 193: ...Notes 193 ...
Страница 194: ...Notes 194 ...
Страница 195: ...Notes 195 ...
Страница 196: ...Notes 196 ...