Inst
alla
tion
Installation: Assembly, connection and start-up
16
Starting up
Multi-family and office building with separate floor access door stations
Block diagram:
multi-family and office building with separate floor access door stations.
Operation
Device
1. Switch on
Customer line safety switch
2. Deactivate
1)
adjustment protection
1)
Deactivated by the contractor.
TwinBus power supply unit 1 7573
3. Activate door station
Door selector switch 1 4982
4. Programming the main doorbell
2)
2)
More information can be found in the indoor video station “Start-up” section starting on page
Assign door station and intercoms
5. Adjust door opening time
TwinBus power supply unit 1 7573, default value 3 s
6. Activate adjustment protection if
required
TwinBus power supply unit 1 7573
4
2
1 7573
2
2
2
1 4585
1 7573
4
1 7630 1 7630
RiTTO
RiTTO
RiTTO
1 4760
1 4751
ED
2
2
1 7573
4
2
1 7630 1 7630
RiTTO
RiTTO
1 4760
1 4751
2
2
RiTTO
1 4760
1 4754
1 4754
2
ED
2
1 7630
ED
2
1 7630
ED
2
1 7630
1 7630
ET2
ET1
2
1 4585
a1
a2
230 V
230 V
2
230 V
B0007-1
Содержание TWINBUS
Страница 2: ...2 ...
Страница 41: ...Installation Assembly connection and start up 41 Installation 00042 0 ...
Страница 156: ...Installation Installation Assembly connection and start up 156 ...
Страница 193: ...Notes 193 ...
Страница 194: ...Notes 194 ...
Страница 195: ...Notes 195 ...
Страница 196: ...Notes 196 ...