INSTALLER
32
G
B
A
800
r
TAU UNIT
boilers must be connected to the metha-
ne or LPG gas supply in compliance with the relevant
standards.
Perform the following checks before making the connec-
tion:
- Check that the boiler is compatible with the type of gas
supply
- Check that the gas supply pipes have been thoroughly
cleaned.
A filter of suitable particle rating should be installed.
b
The gas feed line must be suitable for the flow rate
demanded by the burner. The gas feed system
must also be equipped with all the necessary safety
and control devices required by applicable legisla-
tion and standards.
b
On completion of the installation, check that all
joints are sealed.
TAU 150 - 210 UNIT
GAS CONNECTION
TAU 150
UNIT
TAU 210
UNIT
A (mm)
1784
1794
B (mm)
287
280
G - Gas fitting
Ø 1” M
Ø 1” M
Содержание TAU 150 UNIT
Страница 1: ...INSTALLATION AND MAINTENANCE MANUAL CONDENSING BOILERS TAU 150 210 UNIT...
Страница 70: ...TECHNICAL ASSISTANCE SERVICE 70...
Страница 71: ......